Alexander Ave is closed between Park St and Norwood Ave for emergency asphalt repair due to the water main break in the area. The road will be reopened as soon as repairs are completed.
The Montclair Engineering Bureau is responsible for design and construction management for certain capital improvements to Township streets (curbs, paving and drainage/storm sewers) and parks.
Other responsibilities of the Engineering Bureau include permitting and inspections for road openings and construction of sidewalk, curb and driveway aprons; maintenance of the official street map; and assistance to residents with engineering-related matters.
Township Engineer 219 North Fullerton Avenue Montclair, NJ 07042
Phone: 973.509.5711
Hours: Monday-Friday 8:30 a.m. to 4:30 p.m.